Introduction
Saving energy through better building operation starts with finding opportunities
in four areas that have been shown to have the most frequent problems and the
potential for the greatest benefits. Most O&M-related energy waste falls
into these major categories:
- Equipment Scheduling – Equipment
runs when it is not needed.
- Sensor Error – Erroneous sensor data
causes increased heating, cooling, or equipment operation, which can affect
occupant comfort.
- Simultaneous Heating and Cooling – The
same air gets heated and cooled, or hot and cold air streams get mixed together
to make warm air.
- Outside-Air Usage – Economizer does
not functioning optimally, or excessive outside air causes increased heating
and/or mechanical cooling, and sometimes too little air compromises indoor
air quality.
Three Key Practices
Developing a Building
System Operations Map
Uncovering problems requires a thorough understanding of how a building is
used, operated, and maintained. One way to obtain that understanding is to
develop a Building System Operations Map.
A Building Systems Operations Map documents the current conditions, focusing
on scheduling and on targeting HVAC systems and equipment (see
below) where common opportunities are found in similar buildings and systems.
The map clearly identifies areas for immediate improvement (e.g., changing
thermostat setpoints or equipment schedules) and provides the basis for additional
evaluation. When completed, the map should document the current uses in the
building and how well the operation of the energy systems matches the actual
use.
The map should identify major energy-using systems and occupancy types by
area. Developing the map requires reviewing utility bills, as-built drawings,
and sequences of operations; interviewing building operations and maintenance
staff; and cursorily reviewing systems and equipment with a focus on targeting
particular HVAC systems and equipment for potential energy savings.
Outline of a typical Building System Operations Map:
For central boilers, chillers, and cooling
towers identify:
- Operating schedules and sequences of operation
- Large pumps and circulation loops served
- Fan systems served (terminal units and air handlers)
- Major energy systems served (e.g., water heating, sterilizers)
- General maintenance practices and equipment condition
For each major fan system identify:
- The operating schedule and setpoints
- Occupancy schedule of the area(s) supplied, noting any areas with special
extended operating hours
- Any capability of terminal units or baseboards to run independently of
main fan
- Sequence of operations for terminal units/baseboard
- Sequence of operations for air handler with a focus on control of outside-air
damper, mixed-air temperature, and supply-air temperature
- General maintenance practices and equipment condition
For each major occupancy identify:
- Occupancy schedule
- Lighting schedule and control method
- Equipment schedule and control method
Document on-going problems and what building operators are
doing to compensate:
- Undersized equipment
- Oversized equipment
- Spaces that can’t maintain temperature settings
- Building pressurization problems
- Major HVAC equipment with higher failure rate than typical
The Example Building Systems
Operations Map contains a more detailed list of items to identify.
Using Energy Use Index
(EUI) and Benchmarking
A closer look at a building’s past energy performance and energy-use
pattern, and comparing it to typical similar buildings energy use can further
identify problem areas.
The energy-use index (EUI) is the amount of energy used by a building per
square foot of building floor area. By normalizing energy use to floor area,
buildings can be benchmarked and compared for relative energy performance.
An EUI can be based on whole-building energy use or on specific end uses such
as lighting or heating.
A whole-building EUI is a good measure of overall energy-savings potential.
Much data is available on whole-building EUI for many building types. A building
with a higher EUI than the average similar building is more likely to have
energy-saving opportunities and the magnitude of the difference hints at the
magnitude of potential savings.
Comparing the building’s past performance to current energy performance
can provide further insight and might lead to additional energy savings. Has
the EUI increased over time? Can the increase be correlated to a change in
hours of occupancy, a decrease in vacant space, equipment additions, equipment
changes? If not, it probably indicates an opportunity to reduce energy use.
The Performance Indicators page
discusses tools to help you understand your building’s energy use.
Targeting HVAC Systems and
Equipment
Any HVAC system can be targeted to improve scheduling, outside-air use, and
sensor calibration. The design of the following HVAC system types make them
prone to excessive energy use in certain situations.
| System and Equipment Type |
Where Found |
Opportunities for Savings |
| VAV with Reheat |
Hospitals, offices, other |
Reheat/recool, zone scheduling |
| Constant-Volume with Reheat |
Hospitals, pre-1980 offices and other |
Reheat |
| Dual Duct |
Hospitals, pre-1980 offices and other |
Simultaneous heating and cooling, zone scheduling |
| Multizone Fan |
Hospitals, pre-1980 offices and other |
Simultaneous heating and cooling, zone scheduling |
| Central AC with Perimeter Heating |
Pre-1980 offices and other |
Simultaneous heat and cooling, zone scheduling |
| Heat Recovery |
Hospitals and others with high minimum outside air |
Dirty coils, coil bypass not optimized, non-operational |
| Boilers |
Hospitals and other with central HVAC |
Inefficient combustion, poor staging, steam or steam trap leaks |
| Chillers |
Hospitals, large office, other with central HVAC |
Poor staging, dirty or corroded tubes, increase chilled water temperature |
| Compressed Air System |
Hospitals, shops, older buildings |
Poor staging, leaks |
| Heat Pumps |
Small buildings |
Control of auxiliary heat |
| Water-Loop Heat Pumps |
Most building types. |
Control of loop temperature and outside air, zone scheduling |
The Top Four Savings Opportunities
Equipment Scheduling
The easiest way to save equipment energy is to shut it off.
Occupants rarely complain when equipment runs longer than needed, so it’s
easy for this problem to go unnoticed. A plan or procedure should be put in
place to check occupant requirements and re-evaluate equipment operating schedules
regularly. Typically this should be performed twice a year and whenever there
is a major tenant change.
Poor equipment scheduling has many negative impacts:
- Energy use increases proportionally to operating hours for most non-modulating
equipment such as lighting, plug loads, and constant-volume fans.
- Fan systems with ventilation or exhaust usually use more energy at night
because the ventilation or make-up air is colder.
- Staging equipment to reduce demand charges can actually increase energy
costs. For example, some facilities may stage in equipment over an hour or
two to avoid demand spikes. The spike in current required to start motors
does not last long enough to affect billing demand (which is usually measured
over 15- or 30-minute intervals). The equipment comes online earlier than
necessary, increasing consumption while having no effect on the demand charge.
- Longer operating hours result in shorter equipment life and more frequent
replacement of lamps, ballasts, filters, belts, electric heating coils, contactors,
relays, motors, pumps, chillers, boilers, compressors, and other equipment.
- Increased operating hours cause chiller bundles, boiler tubes, fan coils,
evaporator coils, and condenser coils to require cleaning more frequently.
Walking through the building when it is unoccupied is a good first step in
identifying unnecessary equipment operation. If equipment is running, look
for a reason. It is usually obvious that a lamp or printer should be off, but
HVAC equipment may be running to supply a computer room that needs continuous
conditioning, or to condition some other process load.
See the Energy Performance
Symptoms for Equipment Scheduling page for more information.
Systems that often experience scheduling problems include:
Lighting
Manually controlled (wall switch) lights are usually turned on by occupants
as they arrive, but not always turned off as they leave. Occupants may not
hesitate to turn off lights in a small room, but are reluctant to turn off
large banks of lights if they think someone else might still be in the space.
Things to look for include:
- Is a specific person responsible for turning off the lights?
- Does the custodial staff turn off lights after hours as they go through
the building?
- Do the light switches have "turn off" labels?
If lighting is controlled by a time clock:
- Does the programming match the occupant schedule?
- Does the schedule account for holidays and weekends?
- Is someone responsible for checking the programming regularly to make sure
it meets current occupancy requirements?
- Do the lights actually turn off as programmed?
- Have temporary, special-event schedules been reprogrammed back to normal
schedules?
If there are motion sensors:
- Are they properly oriented to sense occupants?
- Has the time interval to switch the lights off after occupancy been properly
set?
If there are daylight controls:
- Are the sensors situated properly?
- Are the appropriate light levels set?
If problems are suspected, you can attach a data logger to the lighting circuit
and take readings at 15-minute intervals to identify the extent of the problem.
Plug and Process Loads
Plug and process loads are generally manually controlled by occupants. Like
manually controlled lighting, these loads are normally turned on by occupants,
but are often left on longer than necessary. Unlike lighting, custodial staff
are not usually empowered to turn off plug loads like computers or medical
equipment as they go through a building each evening. Some equipment such as
servers, fax machines, and medical equipment may need to run continuously.
Typical scheduling problems to look for include:
- Does the tenant or IT department have a policy or system in place to make
sure computers that have an Energy Star power-saving mode have it enabled?
- Does the tenant have a policy to encourage employees to turn off there
equipment when leaving?
- Are monitors turned off when not in use?
- Are printers and scanners turned off when not in use?
Fan Systems
Most fan systems are controlled by an energy-management system or time clock.
Typical scheduling problems to look for include:
- Do the programmed schedules match occupancy requirements?
- Do programmed schedules accommodate holidays and weekends?
- Are systems checked to make sure fans actually turn off when programming
indicates they are off?
- Are the fans running after hours for minimal tenant occupancy?
- Is optimum start and stop utilized?
- If optimum start/stop is not available, are start times adjusted seasonally
by the building operator?
- Can fan-powered VAV boxes operate independently of the air handler and,
if so, are they programmed to match occupancy?
- Are exhaust fans interlocked with the air handler or controlled separately?
- Can baseboards operate independently from the fan system and, if so, are
they programmed to match occupancy?
Chiller and Boiler Availability
Typical scheduling issues with chillers and boilers include:
- Are chillers locked out when the outside-air temperature is low?
- Are boilers locked out when the outside-air temperature is high?
- Are chillers and boilers prevented from operating at the same time?
- Are there controls to shut off the boiler or chiller when there is no load?
Pumps
Typical scheduling issues for pumps include:
- Are DHW circulating pumps scheduled off when the building is unoccupied?
- Are HW pumps scheduled off when the building is unoccupied and the boiler
is off?
- Are CW pumps scheduled off when the building is unoccupied and the chiller
is off?
- Are condenser pumps scheduled off when the building is unoccupied and the
chiller is off?
- Are HW pumps controlled to run only when there is a demand for HW or when
the outside air is cool?
- Are CW pumps controlled to run only when there is a demand for CW or when
the outside air is warm?
- Are condenser pumps interlocked to run only when there is a coil or process
demand for CW?
Sensor Error
Sensor error can increase energy use, compromise occupant comfort, and prevent
plant and system loads from being met. This is most often caused by uncalibrated
sensors, but can also be due to incorrectly placed sensors, failed sensors,
or mistakes in control set-up.
While building systems use many sensors, critical control sensors are the
most likely to cause severe energy penalties. For example, while space-temperature
sensors cause energy waste and comfort problems, the effect on energy is usually
minor and restricted to one zone. On the other hand, errors of a critical control
sensor such as the temperature of return air at the air handler can cause large
energy penalties affecting many zones, yet may not cause comfort issues. Sensor
error is hard to detect unless the sensors are calibrated regularly.
A wide variety of sensor types are available for HVAC use. Many can be calibrated
and others need to be replaced periodically. It’s important to know the
specifications of the specific sensor in order to maintain it. Older CO2 sensors
need to be calibrated as often as every 2 months, and some newer sensors are
guaranteed to be accurate for the service life of the sensor—5 to 15
years.
Control sensors with the most potential to have a significant effect on energy
use are generally those used to implement resets and control outside air at
air handlers and central plants. While the impacts can be huge, the fix is
simple—regular calibration.
Critical control sensors include:
- Mixed-air temperature sensor
- Return-air temperature sensor
- Outside-air temperature sensor
- Supply-air temperature sensor
- Chilled-water temperature sensor
- Hot-water temperature sensor
- Carbon dioxide sensor
- Carbon monoxide sensor
Some questions to ask:
- Are sensors calibrated at least annually?
- Are critical control sensors calibrated at least twice a year?
- Are critical control sensors replaced on a regular schedule as they approach
the end of their service lives?
Sensor Issues in Disguise
Many sensor problems can appear to be other issues, for example:
- Plant and system loads not met
- Reset schedule not working
- Outside-air economizer not functioning properly
- Boilers and chillers on when not needed
- Equipment not modulating as expected
- Simultaneous heating and cooling
See the Energy Performance
Symptoms for Sensor Errors page for more information.
Simultaneous Heating and Cooling
Most central HVAC fan systems use some form of reheat. Central fan systems
are designed to supply space conditioning to multiple areas in a building.
Each area has its own space-conditioning needs. Typically a central fan supplies
cool air to one or more zones. At the zone level, the quantity of air is usually
modulated to satisfy the cooling load or may need to be reheated to meet a
call for heating. A typical office floor will have electric or hydronic coils
installed in the duct work or in the fan boxes serving the perimeter areas,
while the central area is only cooled.
The temperature of the cool air leaving the air handler (primary supply-air
temperature) determines the amount of reheat required in the various zones.
Control strategies optimize the supply-air temperature and reduce reheat. Usually
the supply air is reset to the highest temperature that can still meet the
largest cooling load. If the control strategy is not optimized, the supply
air will be cooler than necessary and reheating it will use more energy than
necessary.
For example, if the primary air temperature were off by just 1 degree from
optimum, it would cost approximately $1,000/yr in electric reheat (at 6 cents/kWh)
on a system with 20,000 cfm of primary air operating 10 hours/day, 5 days/week.
See the symptom page on “Mixed-air
temperature is near outside-air temperature during cooling mode “ for
more information about diagnosing simultaneous heating and cooling.
See the Case Study of a Sensor
Calibration Problem for an example of simultaneous heating and cooling.
There are many variations of central HVAC fan systems that have similar problems
of simultaneous heating and cooling.
The following are systems that should be targeted in detail for energy saving
O&M opportunities:
In addition to energy costs, simultaneous heating and cooling increases operational
costs. When the central system delivers cooler air than required, the zone
reheat coils must temper the air before it is delivered to the space. The heating
and cooling systems work against each other. This creates additional wear on
electric heating coils, contactors, hot-water pumps, chilled-water pumps, boilers,
chillers, and auxiliaries.
Chillers and boilers may run when none are needed, or a larger chiller or
boiler may be sequenced on when a smaller one could have met the load. Electric
reheat coils are turned on when they could have been left off. Variable-flow
chilled-water and hot-water systems operate at higher flow rates than necessary.
Equipment capacity is reduced because the heating and cooling systems are working
against each other. This can lead to underheated or undercooled areas and occupant
discomfort when capacity is exceeded. Maintenance costs and equipment reliability
are both affected.
See the Energy Performance
Symptoms for Simultaneous Heating and Cooling page for more information.
Outside-Air Usage
Outside air is supplied to a building by the ventilation system in order to
displace indoor air pollutants and provide adequate ventilation for the building
occupants. Proper ventilation rates are needed to maintain indoor air quality.
Building codes require a minimum ventilation rate, usually based on ASHRAE
Standard 62. While buildings are only required to meet the ventilation
code in effect at the time of construction or major remodel, it’s good
practice to provide ventilation that matches the latest codes and standards—if
your HVAC system is capable.
Examples of the currents requirements of Northwest states are:
- Idaho – International Building
Code.
- Oregon – Chapter
4 of Oregon Mechanical Specialty Code. Based on ASHRAE Standard 62 with additional
requirements for Demand Controlled Ventilation.
- Montana – ASHRAE 90.1 for commercial spaces.
- Washington – Default
ventilation rates based on ASHRAE Standard 62-1989 with alternate design
allowed based on ASHRAE Standard 62.1-2004
Economizers
Many buildings use an outdoor air economizer which uses outside air for “free” cooling
when its temperature is below the return air temperature. The economizer varies
the outside-air quantity from the minimum ventilation rate up to 100% outside
air as needed to cool the building.
Scheduling
Energy codes generally require that outside-air dampers are closed when the
building is unoccupied, and open to the minimum ventilation rate when it is
occupied and being heated. When the building needs cooling the economizer activates
and allows additional outside air.
Demand-Controlled Ventilation
Demand-controlled ventilation adjusts the amount of outside air based on the
number of occupants in the space. It is best applied to areas with large variations
in occupancy such as auditoriums, gymnasiums, and large conference rooms. By
adjusting the ventilation rate to meet actual rather than peak occupancy requirements,
you save energy and maintain indoor air quality.
CO2 is an easily measured by-product of humans. Demand-controlled ventilation
typically uses CO2 sensors to control the minimum ventilation rate based on
the difference between ambient outdoor-air CO2 levels and indoor space CO2
levels. The latest ASHRAE standard 62.1-2004 does not specify a specific CO2
difference that must be maintained but older versions of the standard recommended
700 ppm as an adequate differential for controlling odor.
Fixed-Air Systems
In some cases, the fan system is designed to provide outside air at a fixed
rate any time the fan runs. This is used either in very small systems or in
special cases that require 100% ventilation for hazardous processes. Many current
codes require heat recovery on systems that use 70% or more outside air.
Energy Impacts
Heating outdoor air is an energy-intensive and expensive process. Heating
20 cfm (typical for 1 person) of outside air for 14 hours/day, 5 days/week
using electric resistance heat at 6 cents/kWh costs about $28/yr in a typical
Seattle year. If an air handler supplies an extra 1,000 cfm of outside air
it costs approximately $1400/yr under these conditions.
See the Case Study of an
Outside-Air Problem for an example.
Ideally, a building’s ventilation system will provide only the minimum
outside air to meet occupant air-quality needs, except when it can be used
for cooling. Ventilation systems can experience many problems.
Some typical problems include:
- Minimum ventilation rate is never adjusted for a change in occupancy.
- Minimum ventilation rate is set wrong by damper position rather than a
measured airflow.
- Damper leaks when in the unoccupied position.
- Damper does not close when in unoccupied mode.
- Damper stuck in one position.
- Temperature sensors used by economizer are out of calibration or have failed.
- CO2 sensor is improperly located
See the Energy Performance
Symptoms for Outside-Air Usage page for more information.
HVAC Systems and Major Equipment
VAV with Reheat
The figure below shows a simplified schematic of a typical VAV system with
zone reheat and sample operating points. The central fan supplies cool air
to the VAV boxes and the VAV boxes modulate flow as needed to cool the space.
When heating is needed, the VAV boxes reduce flow to minimum and use the reheat
coil to control discharge temperature. There are several variations of this
system (parallel and series fan-powered VAV boxes) but they all use the same
basic reheat strategy illustrated in this example.
In this example the economizer is modulating to produce 60°F mixed air,
matching the setpoint temperature of the primary supply air. No cooling is
needed from the cooling coil. The three VAV boxes use the 60°F supply air
to meet the zones HVAC demands.
Zone A needs heating so the VAV box reduces flow to minimum and turns on the
heating coil to increase the discharge temperature from 60°F to 110°F.
Zone B needs full cooling so the VAV box provides full flow at 60°F.
Zone C needs no cooling or heating so it reduces flow to minimum and uses
reheat to increase the temperature of discharge air from 60°F to 70°F
providing neutral air to the space.
This example illustrates that the temperature of the cool air leaving the
air handler (primary supply air temperature) determines how much reheat is
required both in heating zones and in neutral zones. Control strategies
are used to optimize the supply-air temperature and reduce reheat. The supply-air
temperature can be reset based on time of year, time of day, outside-air temperature,
return-air temperature, the temperature in a representative space, the temperature
in a worst-case cooling zone, or some combination of these. If existing controls
do not automatically reset supply-air temperature, it should be manually reset
at least seasonally.
The temperature of primary supply air is commonly set to about 55°F for
cooling design with central-fan systems. Resets can typically increase primary-supply-air
temperature to 60°F during cold weather and, with very good design, up
to 65°F (though this is not common).
In this example, if the primary-supply-air temperature were fixed at 55°F
(instead of reset to 60°F) the heating energy for Zone A would increase
by 10% and for Zone C by 50%.
Primary targets of a VAV tune-up should be the control strategy for primary-supply-air
temperature and the related sensors and dampers. The following items all have
a major impact on the temperature of primary supply air and related energy
use:
- Calibration of the temperature sensor for primary air
- Calibration of the temperature sensor for mixed air
- Calibration of the temperature sensor for return air
- Calibration of the temperature sensor for outside air
- Economizer dampers
- Calibration of the temperature sensor for space temperature (when used
to reset primary-supply-air temperature)
Constant-Volume with Reheat
The figure below is a simplified schematic of a constant-volume system with
zone reheat and sample operating points. The central fan supplies cool air
to the reheat boxes and the reheat coil is used to control discharge temperature.
Constant-volume fan systems with reheat are generally no longer allowed in
new construction because of their high energy use. The VAV-with-reheat system
shown above is similar except that it reduces air volume as the cooling load
decreases instead of activating a reheat coil. Constant-volume-reheat fan systems
are generally excellent candidates for retrofitting to VAV. When VAV retrofits
are not practical for budgetary or other reasons, it is extremely important
that the constant-volume-reheat fan system be tuned for the best energy performance
possible.
In this example the economizer is modulating to produce 60°F mixed air,
matching the setpoint temperature of the primary supply air. No cooling is
needed from the cooling coil. The three reheat boxes use the 60°F supply
air to meet the zones’ HVAC demands.
Zone A needs heating so the reheat coil increases the discharge temperature
from 60°F to 90°F.
Zone B needs full cooling so the reheat coil is off and the discharge temperature
is 60°F.
Zone C needs no cooling or heating so the reheat coil increases the discharge
temperature from 60°F to 70°F providing neutral air to the space.
This example illustrates that the temperature of the cool air leaving the
air handler (primary-supply-air temperature) determines how much reheat is
required both in heating zones and in any zone that needs less
than full cooling. Control strategies are used to optimize the supply-air
temperature and reduce reheat. The supply-air temperature can be reset based
on time of year, time of day, outside-air temperature, return-air temperature,
the temperature in a representative space, the temperature in a worst-case
cooling zone, or some combination of these. If existing controls do not automatically
reset supply-air temperature, it should be manually reset at least seasonally.
The temperature of primary supply air is commonly set to about 55°F for
cooling design with central fan systems. Resets can typically increase primary-supply-air-temperature
to 60°F during cold weather and, with very good design, up to 65°F
(though this is not common).
In this example, if the primary-supply-air temperature were fixed at 55°F
(instead of reset to 60°F) the heating energy for Zone A would increase
by 17% and for Zone C by 50%.
Primary targets of a tune-up of a constant-volume-reheat system should be
the control strategy for primary-supply-air temperature and related sensors
and dampers. The following items all have a major impact on the temperature
of primary supply air and related energy use:
- Calibration of the temperature sensor for primary air
- Calibration of the temperature sensor for mixed air
- Calibration of the temperature sensor for return air
- Calibration of the temperature sensor for outside air
- Economizer dampers
- Calibration of the temperature sensor for space temperature (when used
to reset primary-supply-air temperature)
Dual Duct
The figure below is a simplified schematic of a dual-duct system. The central
fan supplies air to the hot deck and cold deck. Mixing boxes mix air from the
hot duct and cool duct as needed to maintain space temperature. There are many
variations of this system (variable-air-volume mixing boxes, dual supply fans,
hot deck with 100% return air), but they all produce simultaneous heating and
cooling.
In this example, the economizer is modulating to produce 60°F mixed air,
matching the setpoint temperature of the cold deck. No cooling is needed from
the cooling coil. The hot-deck heating coil is “on” raising hot-deck
temperature from 60°F to 85°F. The three mixing boxes mix various quantities
of 60°F and 85°F air to achieve a discharge temperature that meets
the zones’ HVAC demands.
Zone A needs full heating so the mixing box shuts off the cold-duct damper
and opens the hot-duct damper 100% to produce discharge air at 85°F.
Zone B needs full cooling so the mixing box shuts off the hot-duct damper
and opens the cold-duct damper 100% to produce discharge air at 60°F
Zone C needs no cooling or heating so it mixes 60°F and 85°F air to
produce discharge air at 70°F.
This example illustrates that simultaneous heating and cooling is inherent
in the design of a dual-duct system. If Zone A or Zone B had needed
less than full heating or cooling, the system would have mixed air from the
other ducts as it did for Zone C. To minimize simultaneous heating and
cooling, hot-deck temperatures should be reset cooler as heating load decreases
and cold-deck temperatures should be reset warmer as cooling load decreases.
Control strategies are used to optimize the hot-deck and cold-deck temperatures.
Temperatures can be reset based on time of year, time of day, outside-air temperature,
return-air temperature, the temperature of a representative space, the temperature
in a worst-case cooling/heating zone, or some combination of these. If existing
controls do not automatically reset hot- and cold-deck temperatures, they should
be manually reset at least seasonally.
The design cold-deck temperature is commonly set to about 55°F and the
design hot-deck temperature is commonly set between 105°F and 130°F.
Resets can typically increase the cold-deck temperature to 60°F during
cold weather and, with very good design, up to 65°F (though this is not
common). Resets can typically decrease the hot-deck temperature to 70°F
(or straight return air) during hot weather.
In this example if the cold-deck temperature were fixed at 55°F (instead
of reset to 60°F) and the hot-deck temperature fixed at 120°F (instead
of reset to 85°F), Zone A would be mixing 120°F air with 55°F
air to make 85°F air, Zone B would be mixing 120°F air with 55°F
air to make 60°F air, and Zone C would be mixing 120°F air with
55°F air to make 70°F air. Heating for Zone A and Zone B
increases by 20% and 50% respectively, and Zone B goes from no heating
to needing a mix of 120°F air and 55°F air to make 60°F air. Depending
on relative flows to each zone, the overall energy use of the heating coil
could increase from a minimum of 30% up to over 100%.
Primary targets of a dual-duct tune-up should be the control strategy for
hot- and cold-deck temperatures and related sensors and dampers. The following
items all have a major impact on the temperature of the hot and cold decks
and related energy use:
- Calibration of the temperature sensor for cold deck air
- Calibration of the temperature sensor for hot deck air
- Calibration of the temperature sensor for mixed air
- Calibration of the temperature sensor for return air
- Calibration of the temperature sensor for outside air
- Economizer dampers
- Mixing-box dampers (leakage)
- Calibration of the temperature sensor for space temperature (when used
to reset the hot- or cold-deck temperature)
Leakage of the mixing-box damper is critical with this system. If a mixing
box leaks from the heating duct when it should be fully closed, it will increase
the box discharge temperature and require a colder cold-deck temperature to
achieve the required discharge temperature. The converse is true for leaking
cold-duct dampers. The leakage causes both suboptimal deck temperature and
simultaneous heating and cooling for the leaking box.
Multizone Fan
The figure below is a simplified schematic of a multizone fan system. It is
the same design as the dual-duct system except the location of the mixing dampers
is at the air handler instead of at mixing boxes in the various zones. See
the section on Dual Duct systems for a description
of operations and issues applicable to both systems.
Central AC with Perimeter Heating
The figure below is a simplified schematic of central air conditioning with
perimeter heating and sample operating points. The central AC in this example
is a VAV system with no reheat, and the perimeter heating is baseboard. The
areas served by the VAV and baseboard are open to each other. The VAV system
provides ventilation and cooling while the baseboard offsets heat loss from
the building shell when needed. There are many variations of this layout that
use different cooling or heating equipment, but they all produce simultaneous
heating and cooling along the air border between the perimeter and interior
spaces.
In this example, the VAV system is producing 60°F supply air and varying
it as needed to cool the space and/or provide ventilation. The three zones
each have baseboard heat at the perimeter in addition to VAV supply toward
the interior.
In Zone A, the baseboard and VAV box use separate space-temperature sensors
and have setpoints that should prevent or minimize simultaneous heating and
cooling.
In Zone B, the VAV box and baseboard use the same sensor and a DDC system
would control the VAV box and baseboard to prevent simultaneous heating and
cooling. Hunting between heating and cooling would be prevented if a proper
deadband and throttling range are programmed.
In Zone C, the baseboard and VAV box use separate space-temperature sensors
and have setpoints that would cause simultaneous heating and cooling. Each
thermostat is set to 70°F causing overlap in the throttling range between
heating and cooling. Even if the cooling thermostat is set to 72°F and
heating thermostat is set to 70°F there is little tolerance for throttling
range or sensor calibration error.
Central AC perimeter heating systems should be tuned to prevent or minimize
simultaneous heating and cooling. Things to look for include:
- Regular calibration of space-temperature sensors and thermostats
- Heating and cooling setpoints at least 4 degrees apart
- Deadbands and throttling ranges that prevent hunting between cooling and
heating
- Locks or protective covers that prevent occupants from changing thermostat
settings